You are here: Home » Products » Fire Hydrant & Adaptor » Brass or Bronze Landing Valve for Hydrant System, Germany Standard

CONTACT US

Add: BAIZHANG EAST ROAD 37, YINZHOU AREA, NINGBO ,CHINA.
Factory Add 1: DONGSAO VILLAGE, JIANGBEI AREA, NINGBO, ZHEJIANG, CHINA
Factory Add 2: QINGGANG VILLAGE, TAIZHOU, ZHEJIANG CHINA
Tel: +86-0574-66857216
FAX: +86-0574-87336616

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Brass or Bronze Landing Valve for Hydrant System, Germany Standard

Brass or Bronze Landing Valve for Hydrant System
Availability:
Quantity:
  • 11/2''-21/2''

  • PLB or OEM

  • 848180

  • 11/2''-21/2''

  • 8.5-12.5

  • 1000

Brass or Bronze Landing Valve for Hydrant System, Germany standard

Feature: Brass or bronze material, casting or forged body, steel wheel.
Size: 11/2'', 2'', 2&1/2''


Main Process: Forging, Machining, surface treatment
Standard: JIS, DIN, ASTM, BS, etc
Testing: Supersonic inspection machine, Supersonic flaw detecting machine, physics and chemical analysis.
Packing: Wooden cases or according to customers'needs.


Our company is a professional manufacturer and exporter in hydraulic, water plumbing and heating scope. Our products include brass ball valves, brass gate valves, brass stop valves, bronze valves, brass bibcock, brass fitting, bronze coupling, brass manifold, water meter and all kinds of water meter parts. Such water meter body, water meter fitting and water meter flange. Our product material include brass(CuZn40Pb2), bronze(C83600 and C84400), CW614N, CW617N, CZ122, free lead bronze and brass etc.





Brass hydrant valve

SPECIFICATION

brass valves and brass couplings

Production


HPS Brass or Bronze Landing Valve for Hydrant System, Germany Standard


Product Testing


HPS Brass or Bronze Landing Valve for Hydrant System, Germany Standard


Pls read our FAQ:


1. Is sample available before normal order?
Yes! But customer need to bear express cost. Samples are free.

2. What is your MOQ?

Usually our MOQ is 2000-3000pcs for small size. For big size(11/4’’-2’’), it is 200-1000pcs. But, it is based on products value.
3.How long is the production lead time?
Commonly, it takes 30-35 days. It is depend on material requirement. If it is special material, delivery term will long.

4.Is OEM accepted?
Yes! We can print your logo on the body or cartons.
Previous: 
Next: 
Get Inquiry!
Professional Plumbing Hardware Manufacturer in China

QUICK LINKS

CONTACT INFORMATION

Add: BAIZHANG EAST ROAD 37, YINZHOU AREA, NINGBO ,CHINA.
Factory Add 1: DONGSAO VILLAGE,JIANGBEI AREA, NINGBO, Ningbo, Zhejiang
Factory Add 2: QINGGANG VILLAGE, TAIZHOU, ZHEJIANG CHINA
Tel: +86-0574-66857216
FAX: +86-0574-87336616
CONTACT US
​Copyright © 2022 Ningbo Yinzhou Plumbing Hardware Co., Ltd. All Rights Reserved. Support By Leadong. Sitemap